Contract No. HY/2012/06
Widening of Fanling Highway – Tai Hang to Wo Hop Shek Interchange

Aug 2020
Construction of Signalized Junction at Kau Lung Hang Vehicular Bridge.

Construction of Signalized Junction at Kau Lung Hang Vehicular Bridge.

Resurfacing of Fanling Highway Southbound.

Resurfacing of Fanling Highway Southbound.

Pillar Box Installation at Hub Room of Traffic Control and Surveillance System.

Pillar Box Installation at Hub Room of Traffic Control and Surveillance System.

Landscape Works near Wo Hop Shek Pedestrian and Cycle Bridge.

Landscape Works near Wo Hop Shek Pedestrian and Cycle Bridge.

Construction of Directional Sign at Yuen Leng.

Construction of Directional Sign at Yuen Leng.